[ad_1]
A consortium of Samsung C&T and Lilama Corp. has scooped the function of engineering, procurement, and development (EPC) contractor for Nhon Monitor 3 and 4—Vietnam’s first LNG-fired energy crops.
The principle scope of the practically $1-billion EPC package deal is the development of two crops utilizing trendy mixed cycle fuel generators (CCGTs) with 1-1-1 configuration (1 fuel turbine, 1 warmth restoration boiler, and 1 steam turbine). GE is supplying the CCGTs, which Lilama mentioned would be the new-generation Mannequin 9HA.02. The venture needs to be developed inside 36 months, in accordance with Lilama.
In the course of the EPC package deal deployment, Energy Engineering Consulting Firm 2 (PECC 2) and Fichtner (Germany) participated because the main home and worldwide consulting corporations.
Vietnam at the moment generates most of its electrical energy from coal and is drafting a brand new nationwide energy improvement plan that features 22 LNG-fired energy crops.
The Nhon Trach 3 and 4 venture is positioned in Ong Keo Industrial Park, Nhon Trach District, Dong Nai province, and is predicted to produce electrical energy for 3 giant areas of high-load energy within the Southern Area together with Ho Chi Minh Metropolis, provinces of Dong Nai and Ba Ria-Vung Tau. They would be the first ones to make use of LNG in Vietnam with a complete capability of 1,500 MW (750 MW every). The crops are anticipated to be put into operation in 2023–2024 .
PetroVietnam Fuel mentioned final week it plans to check run Thi Vai within the fourth quarter of 2022. The terminal will provide imported LNG to the 2 energy crops.
[ad_2]
Source link