[ad_1]
Professionals from a division of the APSARA Authority are within the strategy of repairing the traditional Ta Ong Bridge.
The Ta Ong Bridge was constructed through the Angkorian interval and was at the moment in decline. That is the second section of renovation, which began on the start of April and can final till August. The renovation was being funded by the APSARA Authority.
Renovation of the inspiration of this historical bridge is being executed with a view to strengthen the construction of the bridge preserve sturdiness, particularly to facilitate the stream of individuals.
Puth Soth, the official in command of repairing the bridge, mentioned that there have been a whole lot of deterioration on the south of the Ta Ong Bridge. Soth said that the restore workforce made an inventory of stone registration plan, repairing the stone, strengthening the bridge pillars that collapsed and repairing the torn wall.
The deterioration of the bridge was attributed to climate and accumulative stress brought on by the inflow of vacationers.
- Tags: Apsara Authority, Ta Ong Bridge
[ad_2]
Source link