[ad_1]
BAKU, Azerbaijan, October 31. Kazakhstan’s
demand for electrical energy by 2035 is anticipated to be round 27 GW,
Chairman of the Board of Samruk Kazyna Sovereign Wealth Fund
Almassadam Satkaliyev mentioned throughout governmental assembly, Pattern studies citing
Kazakh authorities.
“At the moment, the obtainable capability of present vegetation in Kazakhstan
is 16,200 MW. Bearing in mind the deliberate decommissioning of
energy vegetation and provision of reserves,it is going to be essential to
construct about 17 GW of recent primary, versatile and RES capacities by
2035, of which about 11 GW is deliberate to be carried out by the
Fund,” Satkaliyev mentioned.
In accordance with him, the Fund began implementing 6 precedence
initiatives in electrical energy sector till 2023 for a complete quantity of 1.2
trillion tenge ($2.5 billion).
“It is deliberate to implement 14 precedence initiatives in electrical energy
trade for a complete quantity of greater than 9 trillion tenge ($19
billion). Given the lengthy building time of nuclear energy vegetation,
the development of recent coal-fired era amenities will probably be
required within the close to future. The difficulty of constructing a brand new state
district energy plant in Ekibastuz GRES-1 coal-fired thermal energy
station with a capability of about 1,200 MW is being thought-about”,
Satkaliyev mentioned.
[ad_2]
Source link