[ad_1]
A daily assembly of the capital metropolis authorities was held on July 18. In the beginning of the assembly, Mayor of Ulaanbaatar D.Sumiyabazar expressed his gratitude to the authorities, the personnel, and officers who labored promptly at within the face of the flood state of affairs and arranged to beat the occasion with a minimal harm.
Within the earlier assembly, the mayor gave duties in 21 areas, and the implementation price was about 85 %. It was ordered to completely put together for the winter season, to accentuate the restore of engineering provides, to hold out restoration work in keeping with requirements, and to repeatedly monitor its implementation. On this context, 25 organizations carried out 658 measures, and the implementation price is 55 %.
The districts have established the sub-working teams to investigate the consequences of the catastrophe and assess the harm brought about, and the harm evaluation is ongoing. For instance, in Bayanzurkh District, there are 15 roads and 12 sidewalks broken by floods. A complete of 297 households have been flooded and one family misplaced its house in Chingeltei District. In Khan-Uul District, 322 residents from 68 households, and in Songinohairkhan District 47 households have been affected by flood.
The mayor emphasised that residents’ security needs to be given precedence.
Area of 4,259,619 sq. meters disinfected
Within the neighborhood of Ulaanbaatar, the flood degree of the Tuul River is 202 cm, the harmful flood degree is 260 cm, and on the morning of July 8, it reached 311 cm, exceeding the harmful flood degree by 50 cm. 100 twenty-one thousand individuals from 31,600 households in 26 khoroos of the capital, streets, roads, tunnels and 144 buildings in 11 areas have been affected by floods. Furthermore, 52,965 customers misplaced electrical energy, and there occurred a danger to life, well being, property, and engineering provides. A complete of 14,828 staff carried out duties with 2,203 technics in 18 areas. As well as, 743 individuals from 243 flooded households have been evacuated to security by helicopter, boat and on foot and no casualties have been recorded. Alongside the Tuul and Selbe rivers, sand, gravel and filth have been unloaded, and the dams of the river have been strengthened. A complete of 870 staff and volunteers from 16 organizations labored with 324 equipments and technics, and cleaned an space of twenty-two.7 million sq. meters, and transported 10,540 tons of mud. Between July 10 and 16, a complete space of 4,259,619 sq. meters was disinfected with fogging automobiles. Decontamination was carried out by 9 licensed corporations.
No constructive specimens detected in 57 samples of water and soil
A complete of 28 chemical and bacteriological samples from seven sewage remedy services, 194 chemical and bacteriological samples from six sources of consuming water within the capital, 80 water distribution homes, 11 privately owned abyssinian wells, and samples from a complete of 74 factors decided by the extent of soil air pollution have been delivered to the laboratory. Of the 57 samples, there have been no constructive specimens detected, and the outcomes of different assessments are pending.
The mayor reminded to hold out disinfection ceaselessly.
Danger evaluation deliberate for 89 buildings
Monitoring of constructions, roads, bridges, dams, ditches, and diversions that decelerate the movement of flood water was carried out and a survey of 734 buildings affected by the particular safety zone of the Selbe and Tuul rivers, or an space of 245 hectares, was performed. Eighteen flood-risk areas alongside the Selbe River and the danger standing of the Tuul River dams have been assessed. Furthermore, in cooperation with related organizations, the present state of the dam of the Selbe River was checked, repairs and renovations have been carried out, and buildings that have been flooded have been inspected. Accordingly, plans have been made to evaluate the standard, security or danger of development in 89 buildings. Based mostly on the survey of buildings affected by flood of the Selbe River, a plan was made to conduct a constructing high quality, security or danger evaluation for 89 buildings.
Inspection of all substations and electrical gear performed
Inspection, restore, and emergency service groups labored, and inspections, upkeep and monitoring on electrical and community gear have been carried out repeatedly. Unscheduled inspection of all traces, substations, and electrical gear was carried out, and the detected damages have been eradicated. In the course of the the heightened state of readiness, 434 engineers and technicians with 108 gear have labored. As well as, 117 substations that could be flooded have been inspected, and measures have been taken to stop water to enter into 30 substations.
[ad_2]
Source link