
BAKU, Azerbaijan, October 26.
TajikGidroElectromontaj OJSC (TGEM) has signed a contract to
assemble the 51.4-kilometer Sayidon-Labidjar highway alongside the left
financial institution of the Rogun reservoir in Tajikistan.
In keeping with TGEM, the state-owned Directorate of the Rogun
Hydropower Plant Flood Zone is the shopper for the venture, whereas
financing is offered by the Asian Infrastructure Funding Financial institution
(AIIB).
The highway will embrace 40.8 kilometers of essential highway and 10.6
kilometers of entry roads, with the venture scheduled for
completion over three years.
Moreover, the development is geared toward bettering transport
hyperlinks between settlements within the reservoir space and facilitating
entry to social and financial amenities.
The venture can also be anticipated to help the event of
surrounding areas, strengthen transport connectivity, and enhance
highway infrastructure within the Rogun hydropower plant space.
In keeping with Development’s calculations, the 51.4-kilometer highway
implies a median building tempo of about 17 kilometers a 12 months
over the three-year schedule.
If work begins in late 2026 or early 2027, the highway is prone to
be accomplished round 2029-2030, properly earlier than the World Financial institution’s 2033
goal for full operation of Rogun. The primary highway accounts for
about 79% of the size and the entry roads for about 21%.